Bottle & can groups
Tray-supported or trayless groups, with arranging added as needed.

Sleeve wrapping for individual products or grouped packs.
| Representative sealer | ZF-XZ1400 |
|---|---|
| Sealer power | 3 kW · 220 V, single phase |
| Product size range | W 900–1,300 × H 50–650 mm |
| Sealer conveyor speed | 10–30 m/min |
| Example shrink tunnel | ZF-S1400-3M · 35 kW · 380 V, three phase |
Sealer and tunnel power are stated separately. Conveyor speed is a linear specification. Confirm output with your product, film and infeed.
Tell us your product dimensions, desired pack format and target output so we can recommend a configuration and prepare a quote.
Lead time and paymentReference configuration for the ZF-XZ1400 sealer. See your quotation for the components supplied.
Electrical components can be customized to meet your requirements. The final component configuration will follow the equipment specification agreed for your project.
| Component | Brand |
|---|---|
| PLC | Omron |
| Temperature controllers | Omron |
| Proximity switches | ECOTTER and Omron |
| Switching power supply | MEAN WELL |
| AC contactor | LS |
| Circuit breaker | Mitsubishi |
| Emergency stop switches | Schneider Electric |
| Solenoid valve | AirTAC |
Feed individual products, trays or a prepared group.
Add grouping and alignment when products arrive separately.
Apply film around the selected product arrangement.
Pass the pack through a suitable tunnel and transfer it onward.
Tray-supported or trayless groups, with arranging added as needed.
Select the wrapping opening and handling around the product.
Discuss the tire arrangement and final film coverage required.
Provide the pack width, height, weight and grouping so load support can be matched to the actual pack.
Confirm what the sleeve must cover, which openings are acceptable and whether the wrapped pack clears the tunnel.
Test whether the group stays stable through sealing, transfer and shrinking at your target pace.
No. Prepared trays or stable groups may feed directly; separate items may need grouping and alignment.
Single products and grouped packs can be considered, depending on dimensions and the required film coverage.
These are optional parts of the wider process and should be specified around the project.
We confirm the production schedule after reviewing your equipment configuration and test requirements. The quotation states when lead time starts and the expected date the equipment will be ready for shipment. Transit and on-site work are specified separately when included.
The formal quotation states the payment stages, currency, contracting entity and agreed delivery terms. Where a trade term is quoted, it identifies the named place or port.